+1 707 978 6654 hello@integrationfaces.com
Select Page

Overview

This VirtualBox appliance is for demonstration and testing purposes only, it should not be used in production environment. The VirtualBox appliance is made up of two virtual machines which contain fully configured, ready-to-use Oracle Primavera 15.1 application, all you need is to install Oracle VM VirtualBox on your desktop or laptop and import the Primavera 15.1 applications appliance. The following software is installed in the VirtualBox images;

Virtual Machine #1
  • Oracle Linux 6 Update 6 (64-bit)
  • Oracle Database 11g Release 2 (11.2.0.4.0)
  • Oracle Internet Directory (11.1.1.9.0)
  • Oracle Business Intelligence Enterprise Edition (11.1.1.9.0)
  • Oracle Primavera Prime 15.1 Patch Set 4 (15.1.4.0)
  • Oracle Primavera Data Warehouse 15.1
  • Oracle Primavera Analytics 15.1
  • Java SE Development Kit.
  • Oracle WebLogic Server 10.3.6.12
Virtual Machine #2
  • Oracle Linux 6 Update 6 (64-bit)
  • Oracle Primavera P6 EPPM 15.1 Patch Set 4 Interim Patch 1(15.1.4.1)
  • Oracle Primavera Unifier 15.1 Patch Set 4 (15.1.4.0)
  • Oracle Primavera Gateway 15.1 (15.1.0.0)
  • Java SE Development Kit.
  • Oracle WebLogic Server 12.1.3

Please see the Readme document for detailed instructions on downloading and importing the VirtualBox image.

Downloads

Download and install Oracle VM VirtualBox

primavera-15.1-virtualbox-appliances.ova.7z.001115899

primavera-15.1-virtualbox-appliances.ova.7z.002115899

primavera-15.1-virtualbox-appliances.ova.7z.003115899

primavera-15.1-virtualbox-appliances.ova.7z.004115899

primavera-15.1-virtualbox-appliances.ova.7z.005115899

primavera-15.1-virtualbox-appliances.ova.7z.006115899

primavera-15.1-virtualbox-appliances.ova.7z.007115899

primavera-15.1-virtualbox-appliances.ova.7z.008115899

primavera-15.1-virtualbox-appliances.ova.7z.009115899

primavera-15.1-virtualbox-appliances.ova.7z.010115899

primavera-15.1-virtualbox-appliances.ova.7z.011115899

primavera-15.1-virtualbox-appliances.ova.7z.012115899

checksums(MD5)115899

primavera-15.1-appliance-readme115899

Download an md5sum program (if you use windows) to check if your downloads completed correctly.

Download 7-zip and after all the files have been downloaded, use it t extract the .001 file to obtain the .ova file to import into VirtualBox.

Be sure to download the README file with all the necessary information to use the Virtual Machines.

NOTE: The virtual machines require version 5.x of Oracle VirtualBox