Overview
Better late than never they say, It took me a little longer than I expected to get this FREE Primavera P6 EPPM 16.1 applications appliance ready, I hope it was worth the wait 🙂 . As usual I look forward to your feedback and I wish you all the best as you try out this new version of Oracle Primavera products.
This virtual machine is for demonstration, training, and testing purpose only. If you want to use this Virtual Machine in a production environment, please contact you Oracle Primavera Sale Rep for applicable licenses.
This Oracle VirtualBox appliance contains fully configured, ready-to-use Oracle Primavera 16.1 application, all you have to do is; install Oracle VM VirtualBox on your desktop or laptop and import the Primavera 16.1 applications appliance, yeah it is really that simple – trust me.
If you use Oracle VM Server, you may also import this appliance into your Oracle VM Server infrastructure, this appliance is tested with Oracle VM Server x86 Version 3.4.1.1350
The following Oracle Primavera software plus required enabling technologies are installed in the Oracle VirtualBox appliance;
| Software | Version |
|---|---|
| Oracle Linux (64 Bit) | Release 6 Update 7 |
| Oracle Database 12c Release 2 | 12.1.0.2.0 |
| Oracle WebLogic Server | 12.1.3.0.0 |
| Oracle SQL Developer | 4.1.3.20 |
| Oracle Business Intelligence 11g (BI Publisher) | 11.1.1.9.0 |
| Oracle Business Intelligence 12c | 12.2.1.0.0 |
| Java SE Delopment Kit 64-Bit | 1.8.0_77 and 1.7.0_80 |
| Oracle Primavera P6 EPPM | 16.1.0.0.0 |
| Oracle Primvera Unifier | 16.1.0.0.0 |
| Oracle Primavera Gateway | 16.1.0.0.0 |
| Primavera Analytics | 16.1.0.0.0 |
| Primavera Data Warehouse | 16.1.0.0.0 |
Please see the Readme document for detailed instructions on downloading, importing and using the Oracle VirtualBox appliance.
Downloads
Download and install Oracle VM VirtualBox (version 5.0.20 or higher)
| File | Checksum | Size |
|---|---|---|
| Oracle-Primavera-16.1-apps_DEMO_VM.7z.001 | d5382c7393b6777d5c97dc11a38e7a33 | 4.4GB |
| Oracle-Primavera-16.1-apps_DEMO_VM.7z.002 | 81e77e71a3b85114ccce9c6e09332cfe | 4.4GB |
| Oracle-Primavera-16.1-apps_DEMO_VM.7z.003 | a512bcb4f5ae56edcc19c0ee113ecdb1 | 4.4GB |
| Oracle-Primavera-16.1-apps_DEMO_VM.7z.004 | fc649dae87896aa7b0e687c1298fe8a9 | 4.4GB |
| Oracle-Primavera-16.1-apps_DEMO_VM.7z.005 | bf9c834b61ce117528a74cd3caac283a | 4.4GB |
| Oracle-Primavera-16.1-apps_DEMO_VM.7z.006 | 88db12fe3b6e898973b79cd4dd7fb727 | 4.4GB |
| Oracle-Primavera-16.1-apps_DEMO_VM.7z.007 | 613c84f115f1d80dd43aff36142c693b | 4.4GB |
| Oracle-Primavera-16.1-apps_DEMO_VM.7z.008 | 045a751a822ca3e9f5ecc51a6bcf30af | 2.1GB |
| CHECKSUM.md5 | ||
| Primavera-16.1-appliance-readme.pdf |
Download and install an md5sum program to check if your downloads completed correctly.
Download 7-zip and after all files have been downloaded, use it to extract the .001 to obtain the .ova file to import into VirtualBox. You will need at least 100GB of free space (not including the downloaded files and .ova file) on your computer to import this virtual machine. You may also download the extracted Oracle-Primavera-16.1-apps_DEMO_VM.ova (md5sum 8c4cf38be0986fd7f1ec1b81beea167b, 35GB) file if you wish.
Everything downloaded and installed fine. I am just unable to run it because I don’t know what to do with this:
NOTE: The virtual machine network is configured to use Bridged
Adapter, as a result it will be assigned an IP Address from your
host computer network, please make the necessary changed to the
virtual machine host file to reflect your environment/network.
Knowledge of Oracle VirtualBox and the Linux operating system is
assumed.
Do you happen to have the instructions somewhere for download?
Thanks!
Please disregard the message I just sent you. Page 10 of the read me made me think I had a problem with VB. I googled the issue and found out that virtualization had to be enabled on my BIOS. I’m in Linux now. Thanks for putting this out there!
Thanks for taking the time to put this together. I have tried several times to start the services, but every time I do this error appears: Internal Exception: java.sql.SQLRecoverableException: IO Error: The Network Adapter could not establish the connection
Error Code: 17002
I know you don’t support the VM, but had hoped somebody ran into this and had the fix. Thanks again for the work.
Gavin
Can you please post the output of the following command “ifconfig” along your /etc/hosts file..
It appears you are having a network related problem..
Ben,
You gave me the answer! Yah, Host file had wrong IP.
Thanks!!
Gavin
No worries..
Hello someone please help. node maanger not starting:
following error log
………………….
Domain name mappings:
thanks in advance
Although I typically do not provide support, can you please provide a little bit more information? like what led to the error message?
Thanks
Ben
Although I typically do not provide support, can you please provide a little bit more information? like what led to the error message?
Thanks
Ben
Comment by Ben Mukoro on June 28, 2016 at 10:21 pm
———————————————————————
Thanks a lot.
I amusing Vbox installed on Windows10 Home.
* imported the ova file into Vbox,
*Changed network to Bridge adapter and under ‘Name’ selected the ethernet adapter on host.
(in Advance section :Adapter type: Intel PRO/1000MR Desktop(82540OEM) & Promiscious Mode: Deny & Cable :Connected )
*started the created VM and loggged into it .
Opened cmd console.
Chaned Directory to ………eppm domain/ bin
command : $ nohup sh startNodeManager.sh & then CTRL+C
tail -f nohup.out
Have you checked your network configuration and the /etc/host file; what is the assigned IP address given you are using the bridged network? is it the same as the IP address in the host file?
Can you please post the output of the following command “ifconfig” along your /etc/hosts file..
Thanks
Ben
Hello Ben,
Thanks for your reply. now my system is up and running,
Firstly i had issue in making the the connection itself and when i successfully made the connection, i followed your suggestion. copied the ip address to the host file and rest all was as per written process.
I took quite some time to after trying few trials and good experience.
Thanks a lot
Anil
”””””””
Have you checked your network configuration and the /etc/host file; what is the assigned IP address given you are using the bridged network? is it the same as the IP address in the host file?
Can you please post the output of the following command “ifconfig” along your /etc/hosts file..
Thanks
Ben
Comment by Ben Mukoro on June 29, 2016 at 6:26 pm
Reply
Can you post the instructions for changing the etc/hosts file. I don’t seem to have access to it as the ‘oracle’ user?
Thanks
Hello Ben,
Thanks for this fully integrated VM..i have managed to run the node manager and started all managed servers as well. but Primavera analytics not running due to the application user and the password issues.(demouser &welcome1). My intention is to use P6 Analytics and OBIEE.
regards
Sada
First, thank you for putting together these VMs. They are fantastic.
I have a colleague that is using this VM, but is limited to 16GB of RAM on his physical machine. That and he is trying to run EPPM, Analytics, and Unifier. This combo is consuming his RAM.
We are wondering if we had a second physical machine, could we run the VM on both machines and have them use the same virtual network? The goal would be to have certain applications running on VM1 and others on VM2 to balance the load.
Thank you again for the time and effort it took to build these VMs.
Hello Ben,
When I try to download part number 4 until number 8, It’s asking me for Username and password.
Where I can get it ?
Regards
Waranya
Hello Waranya
No password required to download the files…simply click on the URL.
Thanks
Ben
Hi,
Please help the following error I have after running “/u01/app/oracle/config/domains/eppm_domain/bin/startNodeManager.sh”
Nov 20, 2016 1:37:13 PM oracle.security.jps.internal.idstore.util.LibOvdUtil pushLdapNamesToLibOvd
INFO: Pushed ldap name and types info to libOvd. Ldaps : u01apporacleconfigdomainseppm_domainconfigfmwconfigsystem-jazn-data.xmlidstore.xml.provideridstore.xml.
[EL Severe]: ejb: 2016-11-20 13:39:13.703–ServerSession(1134924425)–Exception [EclipseLink-4002] (Eclipse Persistence Services – 2.5.2.v20140319-9ad6abd): org.eclipse.persistence.exceptions.DatabaseException
Internal Exception: java.sql.SQLRecoverableException: IO Error: The Network Adapter could not establish the connection
Error Code: 17002
[EL Severe]: ejb: 2016-11-20 13:41:13.836–ServerSession(1134924425)–Exception [EclipseLink-4002] (Eclipse Persistence Services – 2.5.2.v20140319-9ad6abd): org.eclipse.persistence.exceptions.DatabaseException
Internal Exception: java.sql.SQLRecoverableException: IO Error: The Network Adapter could not establish the connection
Error Code: 17002
my ifconfig is
[oracle@primavera-vm ~]$ ifconfig
eth0 Link encap:Ethernet HWaddr 08:00:27:83:D1:19
inet addr:192.168.0.55 Bcast:192.168.0.255 Mask:255.255.255.0
inet6 addr: fd07:ecb5:93bd:0:a00:27ff:fe83:d119/64 Scope:Global
inet6 addr: fe80::a00:27ff:fe83:d119/64 Scope:Link
UP BROADCAST RUNNING MULTICAST MTU:1500 Metric:1
RX packets:338 errors:0 dropped:0 overruns:0 frame:0
TX packets:461 errors:0 dropped:0 overruns:0 carrier:0
collisions:0 txqueuelen:1000
RX bytes:31200 (30.4 KiB) TX bytes:36292 (35.4 KiB)
lo Link encap:Local Loopback
inet addr:127.0.0.1 Mask:255.0.0.0
inet6 addr: ::1/128 Scope:Host
UP LOOPBACK RUNNING MTU:65536 Metric:1
RX packets:400 errors:0 dropped:0 overruns:0 frame:0
TX packets:400 errors:0 dropped:0 overruns:0 carrier:0
collisions:0 txqueuelen:0
RX bytes:25224 (24.6 KiB) TX bytes:25224 (24.6 KiB)
[oracle@primavera-vm ~]$
My /etc/hosts file..
# Copyright (c) 1993-2009 Microsoft Corp.
#
# This is a sample HOSTS file used by Microsoft TCP/IP for Windows.
#
# This file contains the mappings of IP addresses to host names. Each
# entry should be kept on an individual line. The IP address should
# be placed in the first column followed by the corresponding host name.
# The IP address and the host name should be separated by at least one
# space.
#
# Additionally, comments (such as these) may be inserted on individual
# lines or following the machine name denoted by a ‘#’ symbol.
#
# For example:
#
# 102.54.94.97 rhino.acme.com # source server
# 38.25.63.10 x.acme.com # x client host
# localhost name resolution is handled within DNS itself.
# 127.0.0.1 localhost
# ::1 localhost
192.168.0.55 primavera-vm.demo
Many thanks for your time and cooperation.
Are you able to ping the primavera-vm.demo host from the VM?
Hi Ben,
I just wanted to ask why Primavera Prime is not included in this pack? I noticed it was included in the previous releases.
Thanks,
Stewart
Hi Stewart
It was not released at the time..
I am still evaluating releasing a 16.2 vm that may include Primavera Prime.
Thanks ben
Hi Ben,
Cheers for yours response. Please see below when I ping
[oracle@primavera-vm ~]$ ping primavera-vm.demo
PING primavera-vm.demo (172.16.10.94) 56(84) bytes of data.
^C
— primavera-vm.demo ping statistics —
6 packets transmitted, 0 received, 100% packet loss, time 5529ms
Please advise.
Many Thanks
Does this VM contains sample projects and demo data for primavera eppm and primavera unifier?
Regards
Sample projects for P6 EPPM only.