Welcome to the Primavera 19.12 release of the Free Pre-built Oracle Primavera Applications VirtualBox appliance series, I want to take the opportunity to apologize for my slow response to your comments/questions/issues, especially around downloading the uploaded files. I have taken the necessary steps to correct the issues with the FTP site. I look forward to your feedback. This virtual machine is for demonstration, training, and testing purposes only. If you want to use this Virtual Machine in a production environment, please contact you Oracle Primavera Sales Rep for the required application license. This Oracle VirtualBox appliance contains fully configured, ready-to-use Oracle Primavera 19.12 applications, all you have to do is, install Oracle VM VirtualBox on your desktop or laptop and import the Primavera 19.12 applications appliance, yeah it is really that simple – trust me. For the first time, the appliance is built on a Microsoft Windows Server Operating System, This is a 180 days evaluation version, that you may extend. This appliance was also tested with VMware ESXi 6.5, steps on how to import this appliance into VMware ESXi is beyond the scope of this blog post. Finally, while this VirtualBox appliance is provided FREE, sadly we are not able to provide free support, please leave your comments and questions and we will do our best to get back to you. The following Oracle Primavera software and required enabling technologies are installed in the Oracle VirtualBox appliance;
Please see the Readme document for detailed instructions on downloading, importing, and using the Oracle VirtualBox appliance, this guide assumes a working knowledge of Oracle VirtualBox Networking and other related settings.
| Software | Version |
|---|---|
| Microsoft Windows Server | 2019 Evaluation |
| Oracle Database 18c Express Edition (XE) | 18.4.0.0.0 |
| Oracle WebLogic Server | 12.2.1.4.0 12.2.1.3.0 |
| Oracle SQL Developer | 19.4.0 |
| Java SE Delopment Kit 64-Bit | 1.8.0_131 1.8.0_231 |
| Oracle Primavera P6 EPPM | 19.12.0.0 |
| Oracle Primvera Unifier | 19.12.0.0 |
| Oracle Primavera Gateway | 19.12.0.0 |
| Oracle Primavera Professional for EPPM | 19.12.0.0 |
| Oracle BI 12c (BI Publisher) | 12.2.1.4.0 |
Can you please provide me the alternate download link? None of the above links are working. Please provide the working links
There are no alternate downloads, what error are you gettig?
Hi,
I found this prebuild primavera applications very useful. Thank you for providing the same. I have one query, you did not provided the URL and credentials for the P6 cloud. I can start and stop the P6 cloud but not able to login to it. Kindly help me with the same.
Regards,
Tushar
Please what do you mean by P6 Cloud?
All passwords and URL’s are available in the documentation.
Cheers
Ben
I have a question, in this version, I feel that it’s missing couple of things such as Primavera Analytics, also Primavera Prime. I understand that Prime is not available for recent versions but I think you could modify it by installing the old version with new other sister software releases but making small hack to fit and it will work. If you could share the Primavera Prime with me I will try to show you how. Thank you very much.
Hi,
Thanks again for putting it together so fast.
However, for some reason, I am getting the following errors starting OBI. It fails to start with the following error:
NMProcess: WARNING: Opening of wallet based credential store failed. Reason java.io.IOException: Failed to lock…
NMProcess: attempt 1: java.io.FileNotFoundException: C:\apps\fmw_12.2.1.3.0_bi_infra\user_projects\domains\bi\config\fmwconfig\bootstrap\cwallet.sso.lck (Access is denied)
NMProcess: attempt 2: java.io.FileNotFoundException: C:\Users\oracle\AppData\Local\Temp\1\pki_data-960537315.lck (The system cannot find the file specified)
NMProcess: Sep 29, 2020 12:08:42 PM oracle.security.jps.internal.config.OpssCommonStartup preStart
NMProcess: INFO: Jps startup failed.
NMProcess: ( was unexpected at this time.
NMProcess: Stopped draining NMProcess
NMProcess: Stopped draining NMProcess