Overview
This VirtualBox appliance is for demonstration and testing purposes only, it should not be used in production environment. The VirtualBox appliance is made up of two virtual machines which contain fully configured, ready-to-use Oracle Primavera 15.1 application, all you need is to install Oracle VM VirtualBox on your desktop or laptop and import the Primavera 15.1 applications appliance. The following software is installed in the VirtualBox images;
Virtual Machine #1
- Oracle Linux 6 Update 6 (64-bit)
- Oracle Database 11g Release 2 (11.2.0.4.0)
- Oracle Internet Directory (11.1.1.9.0)
- Oracle Business Intelligence Enterprise Edition (11.1.1.9.0)
- Oracle Primavera Prime 15.1 Patch Set 4 (15.1.4.0)
- Oracle Primavera Data Warehouse 15.1
- Oracle Primavera Analytics 15.1
- Java SE Development Kit.
- Oracle WebLogic Server 10.3.6.12
Virtual Machine #2
- Oracle Linux 6 Update 6 (64-bit)
- Oracle Primavera P6 EPPM 15.1 Patch Set 4 Interim Patch 1(15.1.4.1)
- Oracle Primavera Unifier 15.1 Patch Set 4 (15.1.4.0)
- Oracle Primavera Gateway 15.1 (15.1.0.0)
- Java SE Development Kit.
- Oracle WebLogic Server 12.1.3
Please see the Readme document for detailed instructions on downloading and importing the VirtualBox image.
Downloads
Download and install Oracle VM VirtualBox
primavera-15.1-virtualbox-appliances.ova.7z.001![]()
primavera-15.1-virtualbox-appliances.ova.7z.002![]()
primavera-15.1-virtualbox-appliances.ova.7z.003![]()
primavera-15.1-virtualbox-appliances.ova.7z.004![]()
primavera-15.1-virtualbox-appliances.ova.7z.005![]()
primavera-15.1-virtualbox-appliances.ova.7z.006![]()
primavera-15.1-virtualbox-appliances.ova.7z.007![]()
primavera-15.1-virtualbox-appliances.ova.7z.008![]()
primavera-15.1-virtualbox-appliances.ova.7z.009![]()
primavera-15.1-virtualbox-appliances.ova.7z.010![]()
primavera-15.1-virtualbox-appliances.ova.7z.011![]()
primavera-15.1-virtualbox-appliances.ova.7z.012![]()
primavera-15.1-appliance-readme![]()
Download an md5sum program (if you use windows) to check if your downloads completed correctly.
Download 7-zip and after all the files have been downloaded, use it t extract the .001 file to obtain the .ova file to import into VirtualBox.
Be sure to download the README file with all the necessary information to use the Virtual Machines.
NOTE: The virtual machines require version 5.x of Oracle VirtualBox
Thanks, Ben, greatly appreciated!
I get the Virtualbox version to work great, but I seem to be unable to import it to VMWare sucessfully. Anybody else got any tips for getting the images to work on WMWare ?
Regards, Jan Inge
Hi there,
I had an issue with machine 02. I’ve started it using the P6EPPM start script. but only the Admin server started and the managed ones was not started. I started the node managed then started all managed servers. Now, all P6EPPM domain servers are running.
but when i try to access the software using the app URL, i got Error 500: Internal Server Error. As below:
//////
Error 500–Internal Server Error
From RFC 2068 Hypertext Transfer Protocol — HTTP/1.1:
10.5.1 500 Internal Server Error
The server encountered an unexpected condition which prevented it from fulfilling the request.
//////
I checked the deployments, found P6 and P6procloudconnect are in OK status but the rest are failed and tried to start them but they failed repeatedly.
I’m not sure what’s wrong, please advise.
Regards,
Is
Unfortunately, I am unable to provide the type of support you require, these VM’s are FREE and knowledge of Linux, WebLogic, and other enabling technologies is assumed.
Cheers
Ben
I am trying to download Primavera virtualimage and it is asking for a login ID .. how do I register to get access?
No login is required..what url are you using to download?
Once again Ben comes up trumps.
Finally got around to firing up the 15.1 VM’s. Slightly clunky to start (my Linux knowledge) – but once they’re up, they’re demonstratable on my laptop. Many thanks!
Great post! I have been looking for this from quiet sometime. Do you know when a pre-built version for 15.2 will be out?
Thanks for your feedback..I will be uploading version 16.1 shortly…
Cheers
Ben
Thanks Ben for the virtual machine. I have successfully downloaded and started the VM-01, but directory service manager OID to OID connection shows a Bind failed error. how can we fix it this error . i dont have much knowledge of server part.
regards
Sada
Hello Sada
Thanks for downloading and testing the VMs, unfortunately, I cannot troubleshoot the issue with you at this time. The good news is that, I will be refreshing the image with P6 EPPM 16.1 once it is released (in a few weeks, I hope).
Cheers
Ben
Hi,
Is there any update on 16.1?
Thanks
Hello
Thanks for the inquiry, actually I am just finalizing the 16.1 image, please come back in a week or so.
Cheers
Ben
Hello, I am trying to download the virtual machine #1, but the ftp server is needs autentication, can you give me the user and password or disable the password
The FTP site is currently down, as I am doing some much needed house-keeping plus uploading Oracle Primavera P6 EPPM 16.1 images
Should be back up in a couple of days.
Also, the FTP site does not require authentication.
Cheers
Ben
Hi,
Copy and paste did not work for me between my PC and the VM. I fixed it by installing VBoxGuestAdditions.iso that comes with virtual box. Would be great if you could add it for next image,
Cheers
Paul
Thanks for your feedback, however since I don’t really know what version of VirtualBox you will be using when you download, I think it is best if you install the VBoxAdditions yourself.. I am sure that is not such a diffcult task if you are a VirtualBox user
Cheers
Ben